The Afsluitdijk (English: Enclosure Dam, Frisian: Ofslútdyk) is a major causeway in the Netherlands, constructed between 1927 and 1933 and running from Den Oever on Wieringen in North Holland province, to the village of Zurich (mun. Wûnseradiel) in Friesland province, over a length of 32 kilometres (20 mi) and a width of 90 m, at an initial height of 7.25 m above sea-level.

It is a fundamental part of the larger Zuiderzee Works, damming off the Zuiderzee, a salt water inlet of the North Sea and turning it into the fresh water lake of the IJsselmeer.

History

Previous experiences had demonstrated that till (boulder clay), rather than just sand or clay, was the best primary material for a structure like the Afsluitdijk, with the added benefit that till was in plentiful supply in the area; it could be retrieved in large quantities by simply dredging it from the bottom of the Zuiderzee. Work started at four points: on both sides of the mainland and on two specially made construction-islands (Kornwerderzand and Breezand) along the line of the future dike.

From these points, the dike slowly grew by ships depositing till into the open sea in two parallel lines. Sand was then poured in between the two dikes and as it emerged above the surface was then covered by another layer of till. The nascent dike was then strengthened from land by basalt rocks and mats of willow switch at its base. The dike could then be finished off by raising it further with sand and finally clay for the surface of the dike, on which grass was planted.

Construction progressed better than expected; at three points along the line of the dike there were deeper underwater trenches where the tidal current was much stronger than elsewhere. These had been considered to be major obstacles to completing the dike, but all of them proved to be relatively straightforward. On 28 May 1932, two years earlier than initially thought, the Zuiderzee ceased to be, as the last tidal trench of the Vlieter was closed by a final bucket of till. The IJsselmeer was born, even though it was still salty at the time.

The dike itself however was not finished yet as it still needed to be brought up to its required height and a road linking Friesland and North Holland (the current A7/E22 motorway) also remained to be built. It would not be until 25 September 1933, that the Afsluitdijk was officially opened, with a monument designed by architect Dudok marking the spot where the dike had been closed. The amount of material used is estimated at 23 million m³ of sand and 13.5 million m³ of till and over the years an average of around four to five thousand workers were involved with the construction every day, relieving some of the unemployment following the Great Depression.

Full article ▸

related documents
Askja
Coastal erosion
Lake Vostok
Geography of the Solomon Islands
Sea of Okhotsk
Barents Sea
Altai Mountains
Geography of Switzerland
Geography of Jersey
Spitsbergen
Great Sandy Desert
Geography of Mozambique
Mountain range
Geography of Fiji
Esker
Strait of Gibraltar
Mont Blanc
Geography of Senegal
Geography of North Korea
Heard Island and McDonald Islands
Cloud forest
Geography of Comoros
Hayling Island
Geography of Turkmenistan
Wollemi National Park
Cumulus cloud
Rathlin Island
Geography of Rwanda
Blizzard
Tundra