Earned value management (EVM) is a project management technique for measuring project progress in an objective manner. EVM has the ability to combine measurements of scope, schedule, and cost in a single integrated system. When properly applied, EVM provides an early warning of performance problems. Additionally, EVM promises to improve the definition of project scope, prevent scope creep, communicate objective progress to stakeholders, and keep the project team focused on achieving progress.

Contents

Introduction to EVM

Essential features of any EVM implementation include

EVM implementations for large or complex projects include many more features, such as indicators and forecasts of cost performance (over budget or under budget) and schedule performance (behind schedule or ahead of schedule). However, the most basic requirement of an EVM system is that it quantifies progress using PV and EV.

Project tracking without EVM

It is helpful to see an example of project tracking that does not include earned value performance management. Consider a project that has been planned in detail, including a time-phased spend plan for all elements of work. Figure 1 shows the cumulative budget for this project as a function of time (the blue line, labeled PV). It also shows the cumulative actual cost of the project (red line) through week 8. To those unfamiliar with EVM, it might appear that this project was over budget through week 4 and then under budget from week 6 through week 8. However, what is missing from this chart is any understanding of how much work has been accomplished during the project. If the project were actually completed at week 8, then the project would actually be well under budget and well ahead of schedule. If, on the other hand, the project is only 10% complete at week 8, the project is significantly over the budget and behind schedule. A method is needed to measure technical performance objectively and quantitatively, and that is what EVM accomplishes.

Full article ▸

related documents
Fiscal policy
Comparative advantage
Economy of France
Economy of Australia
Actuary
Stock market index
Two-part tariff
Market trends
Perfect competition
Monopolistic competition
Alaska Permanent Fund
Tariff
Zero-coupon bond
Celtic Tiger
Quality control
Economy of Hong Kong
Economy of Libya
Economy of Italy
Recession
Economy of Albania
Special Economic Zone
Equity investment
High-yield debt
Cash flow
Economy of the Netherlands
Tertiary sector of the economy
Economy of Slovenia
Toshiba
ISO 4217
Internal rate of return